• Synergy Ecogreen

Is Tesla Poised To Power Its Electric Truck With Solar Panels?

Tesla has a new addition to its line-up, an all-electric Semi truck with two improvements over a traditional truck – reducing emissions and being significantly safer than the diesel counterpart.

Would it make sense to have solar panels on the Tesla Semi? Experts have tried to estimate the effect of Solar PV Systems EPC Services on the trailer roof, and here’s a brief overview.

At the outset, it is important to know that power and energy are two different things. Power is the rate that one would get energy from the sun. The light from the sun produces around 1,000 Watts per square metre, at the surface of the Earth. Synergy Ecogreen Infratech Private Limited  And, in terms of energy, this would be 1,000 Joules per second.


Synergy Ecogreen Infratech Private Limited

What a solar panel can produce on an average depends on various factors, like the efficiency and the angle at which the sunlight hits the panel.( Government Licensed Registered Electrical Contractors ) The estimated power for a solar Semi, based on some assumptions, would first need a size estimate. Assuming, a solar panel covers the entire top of a standard Semi-trailer, the total area could be around 39 square metres. Solar PV Systems EPC Services The next requisite is the time and average incident angle for the sunlight. A rough estimate with a time of around 8 hours at 60% from vertical would have the efficiency of 20%.

The trailer solar panel would reportedly be meaningful when the energy from the panels would be significant with respect to the energy stored in the truck battery. As the Tesla truck size isn’t listed, experts estimate it to the range of 500 miles, which is a sort of diesel truck. So, the energy calculated is around 5346 MJ Electrical Engineering consultants company .

The energy from the solar panel would be around 2% of the total battery energy. Experts believe that even with a deviation in the calculation the total battery capacity would still be at 10%, which implies that it would take around 80 hours to charge the whole battery.

8 views

Recent Posts

See All

SYNERGY ECOGREEN INFRATECH

PRIVATE LIMITED


“Sneha”, H No.8, Survey No.179/5-B, 
Near small Gajanan Maharaj Mandir,
Safalya Nagar, Harsul T Point,
Aurangabad, Maharashtra, India. 431001.


Tel:        +91-240-6630111 

Fax:        +91-240-6630111 

Registered and Corporate Office:

Mobile No: +91 9422201863

Branch Office Addresses 

Aurangabad- “Sneha”, H.No.8, Survey No.179/5-B, Near small Gajanan Maharaj Mandir, Safalya Nagar, Harsul area, Aurangabad. (Maharashtra), India. 431001

Mumbai – Shelter Arcade CHS Ltd, Sector 42, Near D mart, A wing 403, New Mumbai.400706.

Pune - B6/104, SimpliCity, Handewadi Road, Near JSPM College, Hadapsar, Pune- 411028.

Goa Flat No. ASF-27, Shri Maharudra Co-Op. Housing Society, Kavlekar Market, Porvorim, Bardez, Goa. 403521.

Nashik – c/o- Ganesh Pawar, Ujjwal Nagar, Borgad colony, Dindori Road, Masrul Nashik. 422004.

Nagpur - Flat No. 103, Plot No. 111, Elena Apartment Opposite SBI Bank, Manish Nagar, Nagpur - 440015

          

  • Facebook Social Icon
  • Instagram Social Icon
  • Twitter Social Icon
  • LinkedIn Social Icon
  • YouTube Social  Icon
  • Pinterest Social Icon
  • Tumblr Social Icon
  • Snapchat Social Icon
  • Vimeo Social Icon

QUICK LINKS

© 2018 by Synergy Ecogreen Infratech Private Limited Powered by PEARL ORGANISATION.